Specifications

C.24
Dimensional Drawings
GE Power Controls
Copperwork must be supported within 200mm of breaker connections – busbars or cables.
All connections to be tightened to 50Nm.
Arc chute
removal
Minimum space to earth metal
and for arc chute removal
Insulated metal or
insulated sheet
(customer supplied)
100 to door
Minimum clearance
to breaker side.
Fascia centre
ACB fascia
cut-out dimensions
The cut-out
dimensions give an
approximate nominal
clearance of 3mm
around ACB fascia.
These sizes are for
guidance and can be
scaled if a different
aperture is required.
Fascia centre
182 Min
Copperwork must be supported within 200mm of breaker connections – busbars or cables.
All connections to be tightened to 50Nm.
Insulated metal or insulated
sheet (customer supplied)
100 to door
Minimum space to earth metal
and for arc chute removal
Minimum clearance
to breaker side.
Fascia centre
Fascia centre
182 Min
Arc chute
removal
ACB fascia
cut-out dimensions
The cut-out
dimensions give an
approximate nominal
clearance of 3mm
around ACB fascia.
These sizes are for
guidance and can be
scaled if a different
aperture is required.
Front Access Connection
Fixed Pattern
Type N - 4 pole - Frame size 1, In = 400A to 1600A (max)
Type N - 3 pole - Frame size 1, In = 400A to 1600A (max)
C