Specifications

6.5 Case 4: Multi-Ethernet (Building) Backbone
Configuration Examples 6–9
6.5 Case 4: Multi-Ethernet (Building) Backbone
Goal
Design a multi-Ethernet building network. The network is in a multifloor building
and supports several departments.
Design Requirements
Build LANs with WAN access.
A centralized department is located on its own floor in the building, with shared
services and bridging between all LANs in the building.
Four different departments, each located in separate floors of the same building.
New multifunctional teams are formed from the four departments. Users must
have access to their own functional department LAN regardless of their location.
Network management.
This building configuration is similar to Cases 1, 2, and 3 combined.
Suggested Configuration - Central Department:
This configuration is similar to Case 3.
Platform type: Use a DEChub 900 MultiSwitch to support a mixture of half-
height and full-height modules and provide the integral management agent.
Network Modules:
DECswitch 900EE
PORTswitch 900FP
DECbrouter 90T1
DECserver 900TM
DECrepeater 90C
DECrepeater 90T16
Suggested Configuration - Department 1:
This configuration is similar to Case 2.
Platform type: DEChub 90
Network Modules: