User`s guide
3-1
3
Mechanically Installing the
DL3100
3
The following table prioritizes the tasks you will need to perform to
successfully install the DL3100. Refer to the pages noted for detailed
instructions of each task:
When you complete these steps, you are ready to conÞgure the DL3100.
For more information on conÞguring, refer to Chapter 4, ÒConÞguring the
DL3100.Ó
Preparing for the Installation
Before you begin the installation, you need to:
¥ Unpack and inspect the DL3100 for damage that may have occurred
during shipment. Wipe off the exterior with a soft cloth, if necessary.
¥ Save all packing slips and documents included with the unit. Save the
shipping cartons and packing materials until you have completed the
installation and veriÞed the operation.
Table 3-1 Installation Steps
Installation Steps and Page Numbers
“Preparing for the Installation” on page 3-1
“About Mounting the Unit in a Rack” on page 3-4
“Installing the DL3100 with AC Power” on page 3-6
“Connecting the DL3100 to a T3 Network” on page 3-8
“Connecting the DL3100 to a DTE” on page 3-8
“Connecting the DL3100 to an External Clock Source”
on page 3-9
“Connecting an ASCII Terminal” on page 4-1