Installation guide
Remote Server Manager Hardware Installation Guide
16
Step 7. Power-On Sequence
Power up the server in this order:
1. The modem and external power supply
2. The RSM controller power
3. The managed server
This sequence is required to properly initialize the modem with a dialer string that
(among other things) initializes Auto Answer.
After you power up the server, observe the controller's LED through the server’s
vents in the rear of the unit. The LED should begin as red, change to orange, and
finally change to a steady
green
indicating normal operation.
If the LED is not
green
, or the server does not boot, refer to “
Troubleshooting the
Controller
” section.