Specifications

Figure 6–14: LVT Coil and Magnet Assembly
MAGNET MAGNET
GAUGE
LVT BOBBIN
LVT COIL ASSEMBLY
LVT MAGNET
SUPPORT TUBE
AFTER ASSEMBLY, LVT
MAGNET ASSEMBLY MUST
HAVE VISIBLE CLEARANCE
BETWEEN IT AND THE
ADJACENT HOLE
7.84+0.25
(CAUTION MEASUREMENT MUST
BE TO THE MAGNET SUPPORT
TUBE, NOT TO THE EPOXY
IN THE END OF TUBE.)
USE SHIMS
AS REQUIRED TO
PROPERLY ALIGN LVT
MAGNET ASSEMBLY AND
LVT COIL ASSEMBLY
AS SHOWN IN DETAIL
NO GAP IS ALLOWED
BETWEEN BLOCKS AND
MACHINED SURFACES
OF CASTING
M5 x 20 CAP
SCREW IN SENSOR
SUPPORT BRACKET
SENSOR
SUPPORT
BRACKET
TORQUE LVT
MAGNET TO 5.6 N.m
LVT COIL ASSEMBLY
SECTION TROUGH LVT
RE_UK00231A_89
REMOVAL AND REPLACEMENT PROCEDURES 6–25