Operator`s manual
Chapter 2
INSTALLATION AND CHECKOUT
2.1 Overview
This chapter contains the unpacking, checkout and installation proce-
dures for the LG31 printer. This printer must be installedby trained
personell only. Installation time is approximately one hour. The follow-
ing tasks must be performed before the LG31 printer is operational.
• Remove all packaging
• Position the printer
• Remove all transit items
• Install the ribbon, paper, and paper rack/tray/guides
• Install electrical connections (ac power, host interface)
• Set the host interface parameters (for example, baud rate)
• Set the printer parameters (for example, autowrap mode)
INSTALLATION AND CHECKOUT 2–1