Specifications
4
Part Numbers, 5–3
PCBA, replacement
controller, 5–46
mechanism driver, 5–48
power supply, 5–50
Phasing adjustment, 4–4
Physical Inspection, 2–3
Platen
angle adjustment, 4–16
gap adjustment, 4–18
interlock switch assembly, replacement,
5–78
platen open belt adjustment, 4–8
platen open motor, replacement, 5–40
Platen Open, 3–13
Plot, rates, B–6
PMCS. See Preventive Maintenance Checks
and Services
Power supply, PCBA replacement, 5–50
Precedence, commands, A–2
Preventive Maintenance, Checks and Service,
2–2
Preventive Maintenance Checks and Services
(PMCS), 2–2
Principles of operation, E–1
Printed circuit board assembly. See PCBA
Printer
adjustments, 4–1
cleaning, 2–4
command precedence, A–2
configuration, A–1
dimensions, B–3
Duty cycle, B–8
emulations, changing, A–6
inspection, 2–3
maintenance overview, 1–1
preparing the printer for maintenance, 5–3
preventive maintenance checks and ser-
vices, 2–2
principles of operation, E–1
self–tests, 3–26
specifications, B–1
troubleshooting, 3–1
Printing conventions in this manual, 1–3
Printouts
configuration, A–2
hex code, 3–29
Procedures
adjustment, 4–1
cleaning, 2–4
configuration, A–3
inspection, 2–3
replacement, 5–1
PROMs, location and replacement
CCB, 5–52
Mech. Driver, 5–54
R
Replacement
card cage fan assembly, 5–26
circuit breaker, 5–18
control panel assembly, 5–20
controller PCBA, 5–46
cover open switch assembly, 5–74
extension spring, 5–72
gas spring assembly, 5–70
hammer bank cable assembly, 5–8
hammer bank cover assembly, 5–22
hammer bank fan assembly, 5–28, 5–30
hammer spring, 5–32
intermediate cable assembly, 5–10
magnetic pick–up assembly, 5–34