User`s guide

StorageWorks RAID Array 200 Subsystem Family
11. Thread one end of the BN21H-02 cable under the rear handle of the storage
pedestal, as shown in Figure 3-8. Then thread the cable through the opening
at the top of the storage pedestal and toward the front of the pedestal.
To RAID Controller
MR0226
BN21H-02 or
Y-Cable
To JA1
Rear View
JA1
Viewed from Front
Figure 3-8. External Cable Routing
3-10