User`s guide

StorageWorks RAID Array 200 Controller Installation and Standalone Configuration Utility
5–14 EK–SWRA2–IG. C01
5.2.2.1 Cable Installation - Method 1
1. Open the front and rear bezel doors of each pedestal and remove both bezels
from the pedestal by pressing down on the locking tabs at the bottom of each
bezel.
2. Thread one end of the SCSI cable under the rear handle of the pedestal base,
and through the opening at the top of the pedestal to the front of the unit (see
Figure 5–11).
3. Remove the knockout panel or SBB from slot 0 of the pedestal.
4. Loop the cable below the divider plate and connect the cable to connector
JA1 (upper-left connector when viewed from the front) on the backplane
(see Figure 5–11).
5. Replace the knockout panel or SBB in slot 0 and the front and rear bezels
ensuring the locking tabs snap into place at the bottom of each bezel.
6. Insert the other end of the SCSI cable into the appropriate RAID controller
connector at the back of the host system.
Figure 5–11 Routing the SCSI Cable — Method 1