User`s guide
StorageWorks RAID Array 200 Controller Installation and Standalone Configuration Utility
5–4 EK–SWRA2–IG. C01
Figure 5–2 Board Layout of the 3-Channel Controller (PCI Version)
5.1.1 EISA Controller Internal Cabling
1. Orient the internal bus cable as shown in Figure 5-3. Insert the short internal
cable connector into the internal channel-1 connector on the RAID control-
ler.
2. Insert the long cable connector into the internal channel-2 connector.
3. Attach the bulkhead panel with its 68-pin connector to the host system bulk-
head and tighten the screw.