User`s guide

StorageWorks RAID Array 200 Controller Installation and Standalone Configuration Utility
5–2 EK–SWRA2–IG. C01
5.1 Installing the 3-Channel RAID Controller
CAUTION
To avoid static damage, wear a grounded wrist
strap while installing the RAID controller board.
To install the RAID controller board, follow these steps.
1. Turn off power to the computer system and disconnect the power cable.
2. Remove the cover from the host computer system. Refer to the host system
manual for general instructions on removing the cover and installing adapter
boards.
3. Unpack the RAID controller board.
4. If the RAID controller board has uninstalled options, refer to Appendix A and
install the options, then proceed with step 5, below.
5. Inspect the board and confirm that the termination jumpers are properly in-
stalled. These jumpers terminate the SCSI buses on the host end of the bus and
must be in place. (See Table 5-1 and Figures 5-1 and 5-2.)
Table 5–1 SCSI Bus Termination Jumpers
EISA PCI
Channel 0 JP3 JP6
Channel 1 JP4 JP5
Channel 2 JP5 JP1