Specifications
App - 33
Appendix 2 Conversion Specifications for GP-PRO/PB III Series
Appendix 2.9 LS area
5 Checking the operations
• With the GP and the GOT By using the GP and the GOT, compare operations between the
GP and the GOT.
• Check that the operations of the objects (including switches and
lamps) in the converted data are the same as those in the
original data.
• Change the device values of the PLC by using the device test
function of GX Developer, and check the device operations.
-
• Without the GP and the GOT By using GT Simulator2, compare operations between the GP and
the GOT.
• For the GP, convert the data to the GP3000 data by GP-Pro EX
project converter, and check the operations by GP-Pro EX
Simulation.
• For the GOT, check the operations by GT Simulator2.
-
Procedure
Points to be checked
(Including precautions and tips for conversion)
Reference