User's Manual

Table Of Contents
Receiver
DigiTrak
®
F2Operator’s Manual 25
Second Point, 2PT CAL
To record the second calibration point, lift the receiver 3 ft (1 m) directly up, keeping it level, and click the
trigger. The display will count down from 5 to 0. Do not move the receiver while the display is counting
down.
NOTE: The second point screen will display even if the first point fails. After the second point is
recorded, an Χ will appear on the screen and you will hear the failure signal. You must click
the trigger to continue and restart the calibration procedure.
You will see the following screen and hear the confirmation signal when the calibration is complete.
Successful 2PT CAL Screen