User's Manual
Table Of Contents
- System Components
- Getting Started
- Navigating Menus
- Standard Display Screens
- Locating
- The Target Steering Function
- Appendix A: System Specifications and Maintenance Requirements
Navigating Menus
25 DigiTrak
®
F5 User Guide
1Pt Calibration (Above Ground)
Before Calibration:
Ensure that the transmitter is in its housing, parallel to, and
level with the receiver at the appropriate distance, 10 ft (or 3
m), and that the receiver is displaying stable transmitter data.
To Calibrate:
Select the 1 Pt Calibration option from the calibration menu,
the receiver will detect the signal from the transmitter and the
following screen will display.
Perform 1 Pt Calibration Screen
The screen shows the correct setup of the receiver and
transmitter for calibration. Verify the setup and click the
trigger to begin the calibration or toggle right and select the
exit option to be returned to the main menu.
After selecting the checkmark, the screen will show that the
receiver is calibrating. Do not move the receiver while it is
calibrating. Four short tones and a check mark on the screen
indicate a successful calibration.
After a successful calibration, take a depth measurement
without moving the transmitter or receiver. The depth should
be 10 ft ± 5 in. (or 3 m ± 15 cm).
Exit
(Cancels
Calibration)
Accept 1 Pt
Calibration
(Shown
Highlighted)