User's Manual
Table Of Contents
- Safety Precautions and Warnings
- Dear Customer:
- Introduction
- Receiver
- General Description
- Toggle and Trigger Switches
- Audible Tones
- Installing and Removing the Battery Pack
- Power On
- Power Off
- Main Menu
- Locate Mode
- Calibration Menu
- Height-Above-Ground (HAG) Menu
- Settings Menu
- Transmitter Selection Menu
- Drill DataLog Menu
- Pressure-Tension DataLog Menu
- Using the Keypad
- Display Screens
- Standard Receiver Display Screen Symbols
- Transmitter
- Remote Display
- Battery Charger
- System Setup
- Locating
- The Target Steering Function
- Appendix A: System Specifications and Maintenance Requirements
- Appendix B: Projected Depth Versus Actual Depth and the Fore/Aft Offset
- Appendix C: Calculating Depth Based on Distance Between FLP and RLP
- Appendix D: Reference Tables
- LIMITED WARRANTY
System Setup
DigiTrak
®
F5™ Operator’s Manual 59
LL
One-Person Background Signal Strength Check (No Transmitter)
Roll/Pitch Check
At the end of the bore path, turn the receiver to face toward the launch end, and install batteries in the
transmitter to power it up. Have a coworker hold the transmitter and stand a distance to your side
approximately 1.5 times the maximum depth of your intended bore. Walk together in parallel back toward
the launch end keeping the separation distance constant. Periodically stop and have your coworker
change the transmitter’s pitch and roll orientation so that you can verify the speed and accuracy of these
readings on the receiver. Note any locations where the display information becomes erratic or
disappears.
LL
Two-Person Roll/Pitch Test with Transmitter
Intended bore path
Background noise
Intended bore path
1.5X
depth
Red flag area
Red flag area