Setup guide
4
Half-height faceplate installed
Faceplate attachment screw
Faceplate attachment screw
SAS cable connector
SASCABLE1M cable and STR-CTRL card
A. Install the SV4000 chassis with the SV4-RKKIT in an equipment rack
The following instructions apply to the SV4-RKKIT rail kit.
1. Un-package the SV4-RKKIT rail kit. The rail kit is provided with the rail inner channel nested in the outer channel.
Outer channel Inner channel
Front of rack
Rail assembly as shipped (inner channel nested in outer channel)
2. Separate these two channels by sliding the inner channel forward and out of the outer channel. Slide the release latch forward to disengage the detent.
Release latch - slide forward
Inner channel
Outer channel
Separating the inner channel from the outer channel
3. Position the inner channel on the side of the SV4000 chassis as shown below. Note that the stop tab is near the front of the chassis, and the catches on the sides of the chassis are placed through the slots
in the channel. Secure both channels to the chassis with at-head screws - one near the middle of the chassis, and one near the back of the chassis.
Inner
channel
Stop tab
Chassis
Catch SlotScrew
Screw
Chassis with inner channel attached
4. Attach the outer channel to the rack using the hardware provided with the rail kit.
This end to back of rack This end to front of rack