Installation guide
S6 Installation Guide56
8 If your system includes two Knob Modules in a Frame Chassis Large, do the following:
• Connect power to the second Knob Module.
• Take one of the included 12-inch Ethernet cables and connect it to an available chassis port at one end, and connect the other
end to the Knob Module.
• Install the second Knob Module in slot 4, directly above the first Knob Module. Make sure the module sits completely into
the frame and not on any cables
9 Repeat steps 1–7 for all other Channel modules.
Example of a Frame Chassis Large with one Fader Module, one Process Module and two Knob Modules
Channel Modules installed (switch and PSUs not shown)
Slot 1
Slot 3
Slot 2
Slot 4
Fader
Process
Knob
Knob
Module
Module 2
Module 1
Module
Slot 3
Knob
Slot 2
Process
Slot 1
Fader
Module
Module
Module