Installation guide

S6 Installation Guide56
8 If your system includes two Knob Modules in a Frame Chassis Large, do the following:
Connect power to the second Knob Module.
Take one of the included 12-inch Ethernet cables and connect it to an available chassis port at one end, and connect the other
end to the Knob Module.
Install the second Knob Module in slot 4, directly above the first Knob Module. Make sure the module sits completely into
the frame and not on any cables
9 Repeat steps 1–7 for all other Channel modules.
Example of a Frame Chassis Large with one Fader Module, one Process Module and two Knob Modules
Channel Modules installed (switch and PSUs not shown)
Slot 1
Slot 3
Slot 2
Slot 4
Fader
Process
Knob
Knob
Module
Module 2
Module 1
Module
Slot 3
Knob
Slot 2
Process
Slot 1
Fader
Module
Module
Module