Specifications

18
12. REMOVE THE LOCKING SCREW FOR LOAD CELL
The load cell is locked with socket screw and nut during transportation. Please remove
the locking screw, nut and the metal plate during set up as shown in the following drawing.
1.1. When setting up,
release the load cell
a. Loosen the lock nut.
b. Remove socket screw.
c. Remove 4 screws and
the metal plate.
1.2. Before
transportation,
mount load cell lock.
a. Set metal plate with
4 screws.
b. Set the socket screw
until it touches the
load
cell and tighten up one
revolution.
c. Tighten the lock nut.
NOTE :
"
""
"
When
Shipping DC-150
Be Sure To Lock
Scale As Shown
Or Permanent
Damage May
Occur To Load Cell
That Would
Require
Non-Warranty
Replacement.
NOTE : "
""
" When
calibration cannot be performed correctly, please check to see whether all
the screws have been removed.