Instruction Manual

4
3. Turn water supply on to ush the line and then shut the water off
using the ball or gate valve.
4. Wrap the male threads of the PVC adapters with 4-6 layers of Teon
tape, then tighten into the valve with a wrench.
5. Glue ttings to PVC main line and allow to dry.
6. Turn water supply on to pressurize the system. The controller will
open momentarily and then will shut off.
7. The unit is now ready to be programmed
7. PROGRAMMING
• Download the DIG BTT app using the iOS App Store, Google Play, or
the QR code on the box.
• Open the DIG BTT app from your smartphone or tablet and use the
instructions in the App Screens Overview to program and operate
the controller.
Figure 6a
Above-ground installation
Below-ground installation
ow
Figure 6b