Instructions

www.diclaadsystemen.nl
18
NL
DE
EN
1 SAFETY INSTRUCTIONS
Please read this operating instructions carefully first.
Make sure that no voltage is present during the installation of the charging station.
The charging station has been designed in accordance with the most recent
regulations in force, in accordance with IEC 61851.
Safe assembly may only be carried out by a qualified electrician from an approved
company. Improper use can lead to danger of life.
The Built-In charging station consists of 2 parts:
Part 1: The built-in unit
Part 2: The control box including 4 meter control current cable
2 MOUNTING PLAN
Determine the correct location for the charging point. Mark the front side on the
wall, note that the aluminium flush-mounted box is tapered. Saw out the cut-out
neatly (see photo 1).
The built-in unit and the control box must be connected by means of 2 cables, 1
control current cable of maximum 4 meters which is included and a main current
cable for example a ymvk cable 5 x 2.5 mm².
For a 3.7 kW connection, a cable of at least 3 x 2.5 mm² is required. For an 11 kW
connection, a cable of at least 5 x 2.5 mm² is required. Feed the 2 cables through
the bushings and tighten them properly. Drill the holes in the built-in part at the
right place to mount this unit, (see picture 2) keep the height of the rubber seal
(see picture 3) in the mounting calculation. Drill holes for the supplied plugs 6 mm
in the wall.
Now connect the socket, locking mechanism and LED light according to the wiring
diagram (page 5).