4.1 Application of hydro grains
In order to develop a moisture-regulating climate in the charging station, it is
important that the supplied 700 grams of hydro grains are placed at the bottom of
the charging station. Replace the hydro grains once a year.
5 IMPLEMENTING
The cables are connected and the switches are switched off, switch on the power
supplies in the group box. Make sure that each system protection is equipped with
a leakage circuit breaker type EV.
Measure the voltage at the 2 main switches in the charging station using a
multimeter with insulated pins, check the voltage between each Phase and Zero
line. If there is a voltage between each Phase and Zero 230 V, switch on the safety
device 5HS3. After switching on the GSM/GPS module will automatically connect to
the network. When the connection is established, the green LED lights will light up.
This can take several minutes.
In order to test, it has come to pass that the charging station is first registered by
the owner himself via the site deurloo.evc-net.com/register/company.
After registration, the charging station with unique number and the test pass are
linked to the customer.
Lights on the charge point:
Green: Available • Blue: Charging • Red: Disturbance
Mount the cover with the 8 torx stainless steel bolts. Make sure that these bolts are
provided with the supplied plastic rings. After closing the lid completely, it will be
locked with the key.