Instructions

www.diclaadsystemen.nl
25
NL
DE
EN
3 MOUNTING CHARGING STATION
After a good level and firm mounting of the bottom part, the charging station can
be mounted. Before mounting, make sure that the top of the mounting part and
the 4 threaded ends M12 are clean, remove the 4 bolts including the plastic rings.
Unscrew the lid with the supplied torx 20 and open the charging station with the
supplied key, lift the lid upwards. Store the lid, bolts and plastic rings securely
during assembly and avoid damage.
Place the charging station on the bottom section, first place the plastic rings and
then the M 12 nuts. Tighten these with a 19 mm socket wrench. Tighten the glands
well so that they close completely. When a cable gland is not used, it must be
sealed to prevent rising damp.
4 CONNECT GROUND CABLES
At the bottom of the charging station 2 ABB main switches are mounted, these
switches are connected with 10 HS1 and 20 Hs2. Use a No. 2 Pozidrive torque
screwdriver, set it to 2.8 Nm. Mount the power supply on the underside of these
switches, on the underside of 10HS1 the power supply of the control current
protection 5HS3 is also connected.
Be careful when connecting, the switches
have a double clamp function. Make sure that
the power supply for protection 5HS3 is
connected on each terminal side at L1 and
N. Mount the 2 earth litz on the green/yellow
terminals, for each earth wire is 1 terminal 6
mm². Check the height of the earth resistor
with an earth resistor meter < 167 ohm. Make
sure that the switches are in the off position,
this also applies to the control current circuit
breaker 5HS3.