Instruction Manual
Document No: 9100-127-1452-99 Rev B
Page 3 of 5
1501 Route 34 South, Farmingdale, NJ 07727
Tel: (732) 919-3119 Fax: (732) 751-5778 www.dialight.com
Pendent Mount Installation Steps:
• For maximum long term reliability and light output, the light must be installed in free air.
o The High Bay fixture design incorporates an over-temperature control circuit that
reduces input power should internal temperatures reach a maximum level. As a
result, light output may be reduced.
• The High Bay fixture is threaded for 3/4” NPT in order to be assembled to conduit.
o Calculate and measure required conduit length.
o Feed the power cable through the conduit and into the junction box.
o Attach the fixture to the conduit (using pipe sealant).
o Insert 1/4-20 set screw in order to secure the fixture to the conduit.
• Connect power cable conductors as follows:
o For single phase (347 VAC):
Green wire connects to Safety Ground.
White wire connects to Neutral
Black wire connects to Live
o For two phase (480 VAC):
Green wire connects to Safety Ground.
Black wire connects to Line 1.
White wire connects to Line 2.
• Restore power and verify operation.
ANTI
-
ROTATION SCREW
¾” NPT
INLET
CHICO INSTALLED INTO
BASE OF ENTRANCE
(CANNOT BE SEEN)





