Specifications
Continuous Operation F-4
Install/Test the configuration
The module setup modifications are complete. Both modules may now
be bench tested or installed into the final application. The module power
supply and communications connections should be straight forward
during installation.
Make sure that the “DEFAULT*” pin on each module IS NOT connected
to ground. For proper “continuous” operation, another pin on each
module MUST BE connected to ground. The “CONT*” pin on the analog
input module and the “DI2” pin on the analog output module must both
be connected to ground (GND pin).
Turn the power supplies on for both modules, apply an test or real signal
input into the analog input module and some corresponding signal level
should be output from the output module.










