Setup
1
2 3
4 5 6
7 8
9
10
11
12
13
14
1 - brush+glue
2 – sandpaper
3 – screws 3x15 (A) 36 pcs. + 4x25 mm (B)12 pcs.
4 – nails 12 mm (C) 25 pcs. + 25mm (D) 3 pcs..
5 – receiving metal threads (E) 2 pcs. + allen key (F) + adhesive strips 30x80mm (G)
6 pcs. + rubber feet (H) 4 pcs. + screws 3,5x15 mm (I) 4 pcs + wooden pegs (L)8
pcs. + iron bolts 60x5 mm (M) 2pcs.
6 – snare strings 2 pcs.
7- side rienforcements 420x20x9 mm 4 pcs
8- upper front reinforcement 270x25x20 mm 1 pcs.
9- lower front reinforcement 270x25x9 mm 1 pcs.
10 - snare tensioning block 180x25x15 mm 1 pcs.
11 - back side reinforcements 270x20x9 mm 2 pcs.
12 – side panels for cajon
290x452x9 mm 2 pcs.
13 - bottom and top panels for cajon
190x190x9 mm 2 pcs.
BOTTOM PANEL HAS TWO EXTRA HOLES
FOR SNARE MECHANISM
14 – front and back for cajon
290x470x9 mm 2 pcs.
Tools needed: hammer +
screwdriver (not included)




