Manual
Table Of Contents
- 1.Why can't the power reach the maximum power of the
- 2.No agreement can be detected using two cc lines
- 3.Use the tester to trigger fast charge, it cannot
- 4.Why does the PD protocol trigger, when selecting t
- 5.Why does it keep restarting after entering the PD
- 6.Why is the capacity displayed on the tester differ
- 7.The tester automatically restarts when the fast
- 8.Why does the fast charge protocol automatically
12
number of PDOs may be small. Complete PDO please trigger with PD Time shall prevail. If this
problem is solved, the firmware will be updated in the future.(For easier operation, DANGEROUS
will not be prompted after this version!!!)
Note: Do not connect any electrical appliances during the testing process, otherwise the high
voltage triggered during the testing process may burn the electrical appliances!
Note: Do not connect any electrical appliances during the testing process, otherwise the high
voltage triggered during the testing process may burn the electrical appliances!
Figure11 One-click detection page
7.2 QC2.0 trigger
Select QC2.0, press OK shortly to enter the QC2.0 trigger page (as shown in Figure 12),
Trigger Failure will display Trigger Failure!
Figure 12
Instructions
(1) << >>key
Short press: Switch the QC2.0 trigger voltage.
(2) OK key
Long press: Exit the current page. (Still triggering).