Use and Care Manual

Page 12
Page 12
-
-
Instruction
Instruction
Please ALWAYS wear
Please ALWAYS wear
Usage Instruction
Usage Instruction
Concrete Demolition and Rock Breaking has never been EASIER!
3 Easy Steps to SUCCEED: Drill, Mix & Fill
1) Drilling *Please call for applications with depths less than 6 inch.
Use 1.5 inches (3.8 cm) drill bit, holes should be drilled 1 ft (30 cm)
apart. 80-90% of the depth, do not go through. (Diagram 1)
2) Mixing
In a bucket, combine 0.4 gallons (1.5 liters) of water with one 11 lb. (5
kg.) bag of Dexpan
®
. (Diagram 2)
Mix well to a slurry. (a drill and paddle is recommended)
3) Filling
*Use of Dexpan in Extreme Hot Temperature could cause Blowouts.
Dexpan
®
slurry should be poured into holes within 10-15 minutes
after mixing. (Diagram 3)
Coverage: Normally one 11 lb. (5 kg.) bag of Dexpan
®
can fill up to 9
lineal feet (2.5 meters) of 1.5 inches (3.8 cm) diameter holes.
Cracking Or Cutting Time: Properly mixed, the cracks may appear
after 2~8 hours of filling drilled holes, depending on drilling patterns,
temperature, humidity, rock or concrete hardness. Give it 24 hours for
best results.
**WARNING!**
IMPORTANT SAFETY PRECAUTIONS and FIRST AID:
Read safety and operation instruction CAREFULLY.
SAFETY GOGGLES, RUBBER GLOVES and a DUST-PROOF
MASK is required.
**WARNING** BLOWOUTS may occur! DO NOT look directly
into filled holes.
DO NOT breathe in dust. AVOID eye and skin contact. If eye or skin
contact should occur, rinse it off IMMEDIATELY and consult doctor.
Choose correct type of Dexpan based on rock / concrete temperature.
Keep Dexpan
®
in DRY storage. Seal box / bag after use.
Rubber Gloves Safety Goggles Dust Mask
SDS (Safety Data Sheet) and Limited Warranty
are available at www.Dexpan.com
For technical support, Please call our Toll-Free
1
1
-
-
866
866
-
-
272
272
-
-
4378
4378 or 575-528-5454 (USA)
®
1. Drill
2. Mix
3. Pour