Warranty
   •  Rotate the platform (I) out.
   •   Slide platform to the desired position. 
   •  Push platform in to engage platform lever.
FIG. 3
J
FIG. 4
I
PLATFORM POSITION NAIL LENGTH
lowest position  1-1/4" (32mm) - 1-3/4" (44.5mm)
upper position  3/4" (19mm) -1-1/4" (32mm) 
- 1-3/4" (44.5mm)
 6. Place the coil on the nail platform (I). Insert fasteners with 
points down. IMPORTANT: Fasteners must point in the same 
direction as they will be driven.
 7. Uncoil enough nails [approximately 3" (76 mm)] to reach the 
nose of the tool.
  8. Insert the first nail into the nose and the second nail (M) between 
the two rails of the feed pawl as shown in Fig. 5.
NOTE: Be careful not to deform the coil of nails during the loading 
process. Otherwise, the nail guide door will not close and the nails 
might not feed consistently.
FIG. 5
M
  9. Close the canister cover (C) completely.
 10. Close the nail guide door (G) making sure the door latch (D) 
is completely engaged as shown in Fig. 6.
FIG. 6
D
G
Trigger Operation
WARNING: Always wear proper eye [ANSI Z87.1 (CAN/CSA 
Z94.3)] and hearing protection [ANSI S12.6 (S3.19)] when operating 
this tool.
English
8










