Workshop Manual

5
TCD 2015
Job card overview
© 06/2006 8146-001
22/22
W 09-12-01
Removing and installing temperature transmitter
09 Cooling system (continuation)
Job card Activity and additional job cards necessary for its execution
12 Other components
Job card Activity and additional job cards necessary for its execution
W 12-01-04
Removing and installing torsional vibration damper
W 12-06-01
Removing and installing flywheel
W 12-06-03
Renewing toothed starter flywheel ring
W 12-06-01
W 12-08-04
Removing and installing hydraulic pump drive
W 06-01-06
(A-bank)
13 Electrical system
Job card Activity and additional job cards necessary for its execution
W 13-01-02
Removing and installing the cable harness
W 06-02-03
W 13-02-03
Removing and installing the generator (V-belt drive)
W 13-03-02
Removing and installing the starter
W 13-08-01
Removing and installing pressure sensor/temperature sensor (charge air)