Workshop Manual
5
Job card overview
TCD 2015
© 06/2006 8146-001
21/22
W 07-13-01
Removing and installing fuel pressure holding valve
(Railway)
07 Fuel system (continuation)
Job card Activity and additional job cards necessary for its execution
08 Lube oil system
Job card Activity and additional job cards necessary for its execution
W 08-04-06
Removing and installing the oil suction pipe
W 08-04-07
W 08-04-06
Removing and installing oil suction pipe
(Railway)
W 08-04-07
(Railway)
W 08-04-07
Removing and installing the lubricating oil pan
W 13-03-02
W 08-04-07
Removing and installing lubricating oil pan
(Railway)
W 08-08-02
Removing and installing the oil cooler
W 06-07-03
(A-bank)
W 09-08-04
W 08-11-09
Removing and installing oil pressure pick-up
W 08-11-10
Removing and installing pressurestat
W 03-01-11
W 06-07-03
(B-bank)
09 Cooling system
Job card Activity and additional job cards necessary for its execution
W 09-07-08
Removing and installing coolant pump
W 09-08-01
Checking thermostat (removed state)
W 09-08-02
W 09-08-02
Removing and installing thermostat
W 09-08-01 W 09-08-04
W 09-08-04
Removing and installing thermostat housing
W 07-01-04