Workshop Manual

5
Job card overview
TCD 2015
© 06/2006 8146-001
19/22
W 06-02-05
Removing and installing connecting pipe
(Railway)
W 07-01-04
(Railway)
W 06-06-04
Removing and installing the turbocharger
W 06-02-03
W 06-06-04
Removing and installing turbocharger (A-bank)
(Railway)
W 06-06-04
Removing and installing turbocharger (B-bank)
(Railway)
W 06-07-03
Removing and installing charge air pipe (A-bank)
W 03-01-11 W 06-02-05
W 07-03-01
(A-bank)
W 06-07-03
(B-bank)
Removing and installing charge air pipe (B-bank)
W 06-02-05
W 07-03-01
(B-bank)
06 Exhaust system / Charging (continuation)
Job card Activity and additional job cards necessary for its execution
07 Fuel system
Job card Activity and additional job cards necessary for its execution
W 07-01-02
Removing and installing flame glow plug
W 07-01-04
W 07-01-02
Removing and installing flame glow plug (Railway)
W 07-01-04
(Railway)
W 07-01-03
Removing and installing fuel shut-off valve (flame glow plugs)
W 07-01-03
Removing and installing fuel shut-off valve (flame glow plugs) (Railway)
W 07-01-04
Removing and installing fuel pipes (flame glow plugs)
W 06-02-03
W 07-01-04
Removing and installing fuel pipes (flame glow plugs) (Railway)
W 07-03-01
Renewing injection pipes (A-bank)