Workshop Manual

Table Of Contents
© 02/2010 OBJ_DOKU-21747-001.fm
1/6
6
Front cover
TCD 2013 2V W 01-03-01
Removing and installing the front cover
(opposite side to flywheel)
Standard tools:
Feeler gauges
Locking agent
DEUTZ DW 72
W 01-02-01
W 05-01-01
W 16-01-01
Remove the front cover
Remove V-belt pulley.
W 05-01-01
Unscrew screws (1).
Remove clamping strap (2) and fuel supply pump.
Unhook the fuel supply pump at the side.
1
2
© 44540-0
Unscrew screws (1).
Remove holder with impulse transmitter (2).
Remove oil suction pipe
W 16-01-01
1
2
© 44541-0