Job card overview
TCD 2013 2V Sorted alphabetically
Removing and installing the piston cooling nozzles
W 01-08-01 Crankcase
Removing and installing the pressure holding valve
W 01-07-03 Crankcase
Removing and installing the pressure limiting valve
W 21-02-03 Fuel pipes
Removing and installing the pressure/temperature
sensor (charge air)
W 48-03-01 Electrical equipment
Removing and installing the rail
W 21-02-01 Fuel pipes
Removing and installing the rail pressure sensor
W 21-02-05 Fuel pipes
Removing and installing the rocker arm and rocker
arm bracket
W 11-02-01 Control parts
Removing and installing the solenoid valve (exhaust
gas return)
W 08-02-02 Cylinder head
Removing and installing the starter
W 44-03-01 Starter
Removing and installing the thermostat
W 38-01-01 Thermostat housing
Removing and installing the thermostat housing
W 38-02-01 Thermostat housing
Removing and installing the turbocharger
W 43-01-01 Exhaust gas turbocharger
Removing and installing the valves
W 08-04-01 Cylinder head
Removing and installing the V-belt, V-belt pulley
W 05-01-01 V-belt pulley add-on
Removing and installing torsional vibration damper
(V-belt drive)
W 05-02-01 Torsional vibration damper
Renewing the crankshaft sealing ring (flywheel side)
W 09-01-01 Gearcase
Renewing the crankshaft sealing ring (opposite side
to flywheel)
W 01-02-01 Front cover
Setting valve clearance (with exhaust return module
installed)
W 11-01-01 Control parts
Setting valve clearance (with or without removal of
exhaust return module)
W 11-01-01 Control parts
Testing the cylinder liner
W 04-01-02 Cylinder liner
Activity Job card Maintenance group