Workshop Manual

Table Of Contents
4
© 02/2010 OBJ_DOKU-21741-001.fm
14/18
Technical data
TCD 2013 2VTightening specifications
A06 020 Turbocharger on exhaust pipe Nut M10
Insert with DEUTZ S1 moun-
ting compound
TCD 2013 2V 42 Nm
A06 022 Pin bolt on exhaust pipe
Insert with DEUTZ S1 moun-
ting compound
TCD 2013 2V 10 Nm
A06 030 Charge air pipe on cylinder head TCD 2013 2V 11 Nm
A06 042 Heating flange on charge air manifold M8x100-10.9 Stage 1: TCD 2013 2V 3 Nm
A06 042 Heating flange on charge air manifold M8x100-10.9 Stage 2: TCD 2013 2V 30°
A06 046 Charge air manifold on charge air pipe TCD 2013 2V 30 Nm
A07 001 Clamping claw injector on cylinder head
Observe order of assembly.
Install injector without tension.
TCD 2013 2V hand tight 27 Nm
A07 003
Injection lines on rail and pressure pipe nozzle
High pressure pipe at high pressure pump
Union nut
Stage 1:
Observe assembly specifica-
tion.
Use new pipe.
TCD 2013 2V 10 Nm
A07 003
Injection lines on rail and pressure pipe nozzle
High pressure pipe at high pressure pump
Union nut Stage 2: TCD 2013 2V 60°
A07 024 Fuel supply pump on holder TCD 2013 2V 20 Nm
A07 031 High pressure pump to crankcase M10x30-10.9 Screws oiled TCD 2013 2V 10 Nm 50 Nm
A07 032 Control block to crankcase
M8x75
M8x85
Observe tightening sequence TCD 2013 2V 20 Nm
A07 034 Fuel line to high pressure pump TCD 2013 2V 26 Nm
A07 035 Fuel line to control block TCD 2013 2V 34 Nm
A07 038 Rail to cylinder head
Stage 1:
Observe assembly specifica-
tion.
TCD 2013 2V hand tight
A07 038 Rail to cylinder head Stage 2: TCD 2013 2V 30 Nm
ID no. Name Screw type Notes / Remarks Series
Pre-tensio-
ning value
Post-
clamping
value
+15°