Workshop Manual

Table Of Contents
4
© 02/2010 OBJ_DOKU-21741-001.fm
5/18
Technical data
TCD 2013 2V Testing and setting data
P02 26 Radial run-out, crankshaft maximum permissible deviation TCD 2013
L4 2V 0,07 mm
L6 0,10 mm
Main bearing
P02 34 Permissible axial clearance of crankshaft in installed state TCD 2013 2V 0,1 - 0,3 mm
P02 35 Thrust ring, thickness Standard (upper and lower half) TCD 2013 2V 2,9 mm
P02 36 Thrust ring, oversize 1. Step = 0.2 mm TCD 2013 2V 3,1 mm
Con-rod
P02 41
Parallelism of the con rod with respect to the pis-
ton bolt
permissible deviation
at a distance of 100 mm
TCD 2013 2V 0,05 mm
P02 42
Parallelism of the con rod with respect to the pis-
ton bolt
permissible deviation
at a distance of 100 mm
TCD 2013 2V 0,05 mm
P02 43 Piston bolt liner, inside diameter installed, unmachined TCD 2013 2V 42 mm
P02 45
Small end bush clearance between piston pin
and small end bush
TCD 2013 2V 0,034 - 0,056 mm
Big end bearing
P02 52 Big end bearing shells, inside diameter installed TCD 2013 2V72,5 mm
P02 55 Big end bearing, bore in con rod H6 TCD 2013 2V 72,5 mm
P02 56
Theoretical clearance between the big end
bearing / lifting journal
TCD 2013 2V 0,036 - 0,095 mm
Piston bolt
P02 61 Piston pin, diameter TCD 2013 2V 42 mm
Piston
P02 70 Piston Identification of the installation position on the piston base
P02 71 Piston, diameter, standard Measuring point 1 = height 12 mm TCD 2013 2V 107,700 mm
P02 72 Piston, diameter, standard Measuring point 2 = height 64 mm TCD 2013 2V 107,800 mm
ID no. Name Information Series Value Unit
+0,05
0
+0,05
0
+0,05
+0,04
+0,02
0
- 0,006