Operation Manual

Table Of Contents
Job Card No.:
Engine:
Filing No.:
Injector (Cooled)
Removal / Refitment
0178-19-10 1638
© 0784
07.07.01 Page 1 of 2
S/BVM 628
Job
Removing the Injector:
Stop engine. Open indicator valves. Cut out injector
coolant pump. Disconnect injection and coolant pi-
ping, paying attention to the seals. Remove rocker
chamber cover. Unscrew hex. nut (22) and remove
clamp (23) with domed washer (24). Remove screw
(21). Screw stud (25) of removing device into adapter
(19). Fit crossbar (26), washer (27) and hex. nut (28).
Withdraw injector by turning nut (28). Remove de-
vice.
Be sure to remove washer (29) from cylinder
head.
Carefully clean injector receiving hole in head,
especially seat of washer (29), and cover up.
Job Cards:
- 07.03.01
- 07.03.02
Tools:
- Standard tools
- Removing device (Section 1.8)
- Deutz S 1 lubricating compound
(Section 3.6)
- Deutz F 5 lubricating compound
(Section 3.6)
© 51 320 0