Operation Manual

Table Of Contents
Job Card No.:
Engine:
Filing No.:
Injection Pump Control Rod
Removal / Refitment
0178-17-10 2055
07.02.03
S/BV 9 M 628
© 1286
Fig. 1
Job:
Removing Control Rod of Pump No. 1 - Fig. 1 -
Remove control linkage C1 and connection rod (55) between the pumps No. 1 and No. 2 (job 05.04.14).
Remove cover (95) - Fig. 2 - and gasket (94). Then, take down cover (74) with gasket (72). Open lead-seal wire
(205), unscrew hex. bolts (320) and carefully withdraw lever (316) from the two clamping bushes (319).
Job Cards:
- 07.02.06
- 05.04.14
Tools:
- Standard tools
- Deutz DW 59 locking compound (Sec-
tion 3.6)
Removal and reinstallation of the plungers re-
quire removal of the control rod. This can be
done with the fuel injection pump mounted,
otherwise remove injection pump as descri-
bed on Job Card 07.04.01.
Page 1 of 4
© 25 341 1