Operation Manual

Table Of Contents
Job Card No.:
Engine:
Filing No.:
Injection Pump Control Rod
Removal / Refitment
0178-17-10 2054
07.02.03 Page 1 of 4
S/BV 6/8 M 628
© 1286
Fig. 1
Job:
Removing Control Rod of Pump No. 1 - Fig. 1 -
Remove control linkage C1 and connection rod (55) between the pumps No. 1 and No. 2 (Job Card 05.04.14).
Remove cover (95) - Fig. 2 - and gasket (94). Then, take down cover (74) with gasket (72). Open lead-seal wire
(205), unscrew hex. bolts (320) and carefully withdraw lever (316) from the two clamping bushes (319).
Removal and reinstallation of the plungers
require removal of the control rod. This can be
done with the fuel injection pump mounted,
otherwise remove injection pump as descri-
bed on Job Card 07.04.01.
Job Cards:
- 07.02.06
- 05.04.14
Tools:
- Standard tools
- Deutz DW 59 locking compound
(Section 3.6)
© 25 342 1