Operation Manual

Table Of Contents
Job Card No.:
Engine:
Filing No.:
Charge Air Cooler
Removal / Refitment
0178-58-10 1136
06.04.01
S/BV 6/8/9 M 628
© 0595
Refitting the Cooler
Inspect gasket (8) and (10) and replace if defective. Cooler refitment is made in the reverse order. Connect
feed and discharge piping as well as breather pipe. Fill up system with a newly prepared coolant (see Section
6.4).
Fig. 1
Tools:
- Standard tools
- Hoist
Job:
Removing the Cooler
Close shut-off valves in water feed and discharge
piping. Open drain cock. Disconnect water piping.
Retain charge air pipe (1) plus control unit and sup-
port to prevent turning sideways. Retain cooler (2) by
hoist. Unscrew (6) bolts (7) and remove pipe (5).
Unscrew bolts (9) and remove cooler (2).
© 51 405 0