Operation Manual

Table Of Contents
Job Card No.:
Engine:
Filing No.:
Charge Air System
0178-87-10 1133
06.02.01
S/BV 6/8/9 M 628
© 0595
Inspection
When a piston is overhauled, inspect charge air
piping inside and clean as necessary.
If the water detector in the charge air pipe
gives an alarm check charge air cooler (2) for
leaks.
Job:
Remove covers (3) and (4). For removal of the latter
loosen bolts (5) and tilt cover.
Inspect pipe inside.
When cleaning the pipe, be sure no dirt or detergents
will find ingress into the cylinder head inlet.
Refit cover (3) with new gasket (6) and cover (4) with
O-seal (7).
If seal (7) is defective, replace. Install seal with a coat
of Deutz F5 compound.
Check that bolts securing charge air cooler to brak-
ket and bolts (8) securing charge air pipe to cylinder
heads are tight.
Fig. 3
Fig. 2
Fig. 1
Tools:
- Standard tools
- „Deutz F5“ (Section 3.6)
© 50 402 0
© 50 403 0
© 50 404 0