Operation Manual

Table Of Contents
Job Card No.:
Engine:
Filing No.:
Barber-Colman plus 8 Electronic Governor Linkage
Setting
0178-29-10 1810
© 1283
05.04.14 Page 11 of 12
S/BV 6/8 M 628
Fig. 18
13. Check that linkage abuts at stop screw (*) -
Fig. 18 - when pushed to maximum load (point
A13).
Upon completion of the setting, lead-seal the
engine output (**).
12. Set stop screw A13 so that load indicator on
injection pump points to graduation (14) - Fig.
17.
© 24 938 1
© 24 939 1