Operation Manual

Table Of Contents
Job Card No.:
Engine:
Filing No.:
Woodward UG8D/UG8L Hydraulic Governor Linkage
Setting
0178-29-10 1808
05.04.14 Page 10 of 12
S/BV 6/8 M 628
Section A - B
Graduation
Governor Injection Pump
20
0 - 2,5 to - 5
9 approx. 14
Fig. 17
Injection Pump
Governor
Typical setting
© 0583
11. Adjust linkage at points C8 (*) or C10 (**) - Fig.
17 - so as to obtain the settings scheduled in
table at right. Then tighten all locknuts.
© 24 937 1
© 24 936 1