Operation Manual

Table Of Contents
Job Card No.:
Engine:
Filing No.:
Woodward UG8D/UG8L Hydraulic Governor Linkage
Setting
0178-29-10 1808
05.04.14 Page 2 of 12
S/BV 6/8 M 628
© 1084
Unscrew chees-head screws (60) - Fig. 2 -. Remove gaskets (64). Push covers (59) and bellows (29) towards
the middle of links (55). Then undo cheese-head screws (62) and scrap. Remove flat irons (63). Slacken
eccentrics (61) and carefully lift links out of the injection pumps.
After undoing the fastening screw A5 (Fig. 1) of the link C1, the injection pumps can be taken down.
Fig. 2
© 24 924 1