Operation Manual

Table Of Contents
Job Card No.:
Engine:
Filing No.:
Timing Gear Train
Removal / Refitment
0178-09-10 1601
04.04.01 Page 4 of 4
S/BV 6/8/9 M 628
Refitting Idler Gear (35) - Fig. 3
Turn flywheel until its aperture coincides with bearing hole in timing chest. Apply thin film of oil to fulcrum (44)
and bearing bush in gear (35). Apply grease to washer (46) and stick in recess of gear (35). Raise gear (35) in
chest and install fulcrum (44) with O-seal (50). Fit retainer plate (34), srew bolt (33) in place with DEUTZ DW 60.
Fit O-seal (52) onto bolt (32). Insert bolt (32) in fulcrum (44) and secure by cap nut (43), tightening as specified
(section 3.5, item 40).
Refitting Camshaft Gear (5)
See job 04.06.01.
Mount cover (104) together with gasket (52) (renew gasket if necessary).
Refitting Injection Pump Drive Gear (8) - Fig. 4
Apply thin film of oil to part (10) and bearing bush in flange (12). Install gear (8) in chest and push part (10) into
flange (12) and gear (8). Fit screws (9). Time injection (job 07.06.01).
After installing the Gears:
Check backlash of the gears (job 04.08.01). Inspect gaskets (25), (31) and (37), renewing if necessary. Mount
covers (24), (30) and (36), together with gaskets.
© 1283