Operation Manual

Table Of Contents
Job Card No.
Engine:
Filing No.:
Foundation Bolts
Inspection
0178-46-10 1173
Job:
Strike chocks/shims (2) and (3) respectively with a
hammer and check that this will produce a solid
metallic sound. Failing this, bolts (4), (5), (6) are liable
to be slack and must therefore be retightened as
specified by the foundation erector. Thereafter, mea-
sure crankweb deflection (job 02.02.01).
Cleanliness is very important, in particular, do not let the foundation come in contact with oil or water.
Rigid Mounting Resilient Mounting
03.07.01
S/BVM 628
Inspection
The effects of heat and internal stressing may effect
the foundation, so make sure that engine foundation
bolts are tight (even where piping renders the access
difficult).
Job Card:
- 02.02.01
Tools:
- Standard tools
© 1283
Inspection is especially important during the
initial 50 running hours of the engine.
© 51 278 0