Operation Manual

Table Of Contents
Job Card No.:
Engine:
Filing No.:
©0185
Main Bearing
Refitment
0178-01-10 1837
02.08.01 Page 3 of 3
S/BVM 628
Fig. 5
Bead
Where studs (2) must be renewed, apply Deutz DW 60 compound to length of threads of new studs, screw
into crankcase as far as they will go and tighten through 130 Nm (13 kpm).
Refit oil sump (if removed) after application of Deutz DW 48 compound as a continuous "bead" (Fig. 5)
of 2 - 3 mm width (not more) on the joint face.
© 51 263 0