Operation Manual

Table Of Contents
Job Card No.:
Engine:
Filing No.:
Cylinder Head
Removal
0178-08-10 1798
© 0583
01.04.01 Page 1 of 3
S/BV 6/8/9M 628
Job:
Observe safety precautions (Job Card 02.00.01).
Drain cooling water. Remove rocker chamber cover
(4) - fig 1 - and turn engine so that inlet and exhaust
valves are closed. Release valve clearance adjusting
screws (3) on rocker arms. Disconnect pilot air pipe
at the joint above the starting pipe. Release two hex.
bolts securing indicator cock and turn cock. If ne-
cessary, remove. Release locks (16) - fig 3 - on
sliding piece of the charge air piping (5) and move
sliding pieces sideways. Disconnect injection piping
and main starting air pipe from cylinder head. Un-
screw 4 bolts (22) - fig 2 - on exhaust elbow (20).
Screw puller screw (19) into exhaust elbow and
remove exhaust gasket (21).
Bild 3
Fig. 2
Fig. 1
Job Cards:
- 01.08.01
- 01.09.01
- 02.00.01
- 02.16.02
- 09.00.01
Tools:
- Standard tools,
- Puller screw,
- Hydraulic tool for annular nuts (Section
1.8),
- Head removing device (Section 1.8) ,
- Wooden support
© 51 394 0
© 24 814 2
© 51 233 0