Workshop Manual
Table Of Contents
- Workshop Manual
- 1 Foreword
- 2 General
- 3 User notes
- 5 Job card overview
- 5.1 Sorted alphabetically
- 5.2 Sorted numerically
- 6 Job cards
- Checking the compression pressure
- Mounting engine on assembly block and demounting
- Setting valve clearance
- Removing and installing the rocker arm and rocker arm bracket
- Renewing the crankshaft sealing ring (flywheel side)
- Renewing the crankshaft sealing ring (opposite side to flywheel)
- Removing and installing the crankcase bleeding
- Removing and installing rear cover
- Removing and installing the connection housing
- Renew camshaft sealing ring (opposite side to flywheel)
- Check control times
- Renew toothed belt and tensioning pulley
- Removing and installing the toothed belt wheel
- Removing and installing the impulse transmitter
- Removing and installing the exhaust damper
- Removing and installing the exhaust line
- Removing and install the charge air line
- Removing and installing the turbocharger
- Removing and installing the intake manifold
- Removing and installing the exhaust gas return valve
- Removing and installing the exhaust gas return pipe
- Removing and installing the exhaust gas collection pipe (Exhaust gas recirculation)
- Removing and installing the sensor (Exhaust gas recirculation)
- Removing and installing the magnet clip (Exhaust gas recirculation)
- Removing and installing the lifting magnet (Start amount release)
- Renewing the injection lines
- Removing and installing the fuel injector pump
- Check start of injection
- Calculating the thickness of shim
- Removing and installing the fuel injectors
- Removing and installing the lifting magnet (charge air pressure-dependent full load stop)
- Installing and removing charge air pressure-dependent full load stop
- Removing and installing fuel pipes
- Removing and installing the fuel filter console
- Removing and installing the fuel filter console
- Removing and installing the fuel supply pump
- Removing and installing the lubricating oil pump
- Removing and installing the oil suction pipe
- Removing and installing the lubricating oil pan (metal sheet lubricating oil pan)
- Removing and installing the lubricating oil cooler
- Removing and installing the oil pressure regulating valve
- Removing and installing the oil filter console
- Removing and installing the oil pressure switch
- Removing and installing temperature transmitter
- Removing and installing the thermostat (Lubricating oil cooler)
- Removing and installing the control line
- Remove and install the cooling blower
- Dismantling and assembling the cooling blower
- Removing and installing air duct
- Removing and installing the air bearing
- Removing and installing the lifting magnet (Engine shutdown)
- Removing and installing the V-belt pulley
- Renew V-belts, check V-belt tension
- Removing and installing the flywheel
- Removing and installing the hydraulic pump
- Renew toothed belt and tensioning pulley (Hydraulic pump)
- Removing and installing the generator
- Removing and installing the starter
- Removing and installing the starter
- Removing and installing the heating plugs
- Removing and installing the glow plug
- 7 Standard tools
- 8 Special tools
© 01/2009 OBJ_DOKU-24382-001.fm
2/14
8
D 2011
TD 2011Special tools
Orders
The tools can be ordered directly, stating the order
number, from:
WILBAER
Wilhelm Bäcker GmbH & Co.KG
Postfach 14 05 80
42826 Remscheid
Germany
Tel.: +49 (0) 2191 9339-0
Fax: +49 (0) 2191 9339-200
E-mail: info@wilbaer.de
Web: http://www.deutz-tools.com