Workshop Manual
Table Of Contents
- Workshop Manual
- Foreword
- General
- User notes
- Technical data (Test and adjustment data)
- Technical data (Tightening specification)
- Job card overview (Sorted alphabetically)
- Job card overview (Sorted numerically)
- Job card overview (Job card references)
- W 00-02-06 Check compression
- W 00-05-01 Mount engine on assembly stand and disassemble
- W 01-01-01 Check and set valve clearance
- W 01-02-02 Remove and install toggle lever and toggle lever block
- W 01-02-06 Disassemble and complete, check toggle lever and toggle lever block
- W 01-04-04 Remove and install cylinder head
- W 03-01-11 Remove and install crankcase bleeding
- W 06-01-05 Remove and install exhaust manifold
- W 06-06-04 Remove and install turbocharger
- W 06-07-03 Remove and install air intake pipe
- W 07-02-07 Remove and install lifting magnet for start volume release
- W 07-03-01 Renew injection lines
- W 07-07-01 Remove and install injection valves (in engines with leak fuel line)
- W 07-08-01 Remove and install solenoid valve (LDA)
- W 07-08-02 Remove and install charge pressure full load stop (LDA)
- W 07-10-06 Remove and install fuel lines (with Motorpal injection pumps)
- W 07-10-06 Remove and install fuel lines (with Bosch injection pumps)
- W 07-10-08 Remove and install fuel filter console
- W 07-11-01 Remove and install fuel pump
- W 08-08-02 Remove and install oil cooler
- W 08-10-06 Remove and install oil filter cartridge
- W 08-11-07 Remove and install oil filter console
- W 08-11-08 Remove and install oil pressure switch
- W 08-11-09 Remove and install oil pressure sensor
- W 08-11-11 Remove and install oil temperature sensor
- W 08-11-12 Remove and install oil thermostat (oil cooler)
- W 08-15-01 Remove and install oil pressure line (turbocharger)
- W 08-15-02 Remove and install oil return line (turbocharger)
- W 08-16-01 Remove and install oil line for injection adjuster supply
- W 09-11-01 Remove and install cooling blower
- W 11-00-03 Remove and install lifting magnet (shutoff magnet)
- W 12-02-01 Check, renew V-belt (in FM, BFM engines)
- W 12-02-01 Check V-belt, renew (in FL and BFL engines)
- W 12-02-06 Remove and install V-belt clamping roller
- W 12-06-01 Remove and install flywheel
- W 12-08-02 Remove and install hydraulic pump
- W 13-01-02 Remove and install cable harness
- W 13-02-03 Remove and install generator (in FL and BFL engines)
- W 13-02-03 Remove and install generator (in FM and BFM engines)
- W 13-03-02 Remove and install starter
- W 13-06-01 Remove and install helical heater plug
- Commercial tools
- Special tools
0312 1555 - 0138
2/4
© 11/2004
6
Cylinder head
W 01-01-01
2011
Note
Valve overlap means:
- Outlet valve not yet closed.
- The inlet valve starts opening.
© 39133 0
Check valve clearance
z Arrangement of inlet and outlet valves.
- IN = inlet valve
- EX = outlet valve
© 39134 0
EX EX EX EX
IN IN IN IN
z Check valve clearance setting with feeler gauge
blade on the appropriate cylinder.
Note
The feeler gauge blade must go between the
toggle lever sliding surface and the valve with
little resistance.
© 39135 0
01 63 01 61
01 62