Workshop Manual

Table Of Contents
0312 1645 - 0138
3/4
© 11/2004
5
5 Job card overview
5.2 Sorted numerically
2011
Job card Activity Maintenance group
W 00-02-06 Check compression Engine general
W 00-05-01 Assemble and disassemble engine on engine block Engine general
W 01-01-01 Check and set valve clearance Cylinder head
W 01-02-02 Remove and install toggle lever and toggle lever block Cylinder head
W 01-02-06
Disassemble and complete, check toggle lever and toggle
lever block
Cylinder head
W 01-04-04 Remove and install cylinder head Cylinder head
W 03-01-11 Remove and install crankcase bleeding Crankcase
W 06-01-05 Remove and install exhaust manifold Exhaust system / Charging
W 06-06-04 Remove and install turbocharger Exhaust system / Charging
W 06-07-03 Remove and install air intake pipe Exhaust system / Charging
W 07-02-07 Remove and install lifting magnet for start volume release Fuel system
W 07-03-01 Renew injection lines Fuel system
W 07-07-01 Remove and install injection valves Fuel system
W 07-08-01 Remove and install solenoid valve (LDA) Fuel system
W 07-08-02
Remove and install charge pressure-depedent full load stop
(LDA)
Fuel system
W 07-10-06 Remove and install fuel lines (with Bosch injection pumps) Fuel system
W 07-10-06 Remove and install fuel lines (with leak fuel line) Fuel system
W 07-10-08 Remove and install fuel filter console Fuel system
W 07-11-01 Remove and install fuel pump Fuel system
W 08-08-02 Remove and install oil cooler Lube oil system
W 08-10-06 Remove and install oil filter cartridge Lube oil system
W 08-11-07 Remove and install oil filter console Lube oil system
W 08-11-08 Remove and install oil pressure switch Lube oil system
W 08-11-09 Remove and install oil pressure sensor Lube oil system